Main Contractor: Fletcher Construction
Date: 2010
Conslab constructed all the concrete to this project including designing and constructing the a 12,000m2 post tensioned floor to the main warehouse, erecting the precast wall panels, constructing the concrete structure of the two storey office block, complete with ground polished floor slabs.