Kings Wharf
Wellington
Client: Centreport
Date: 2009
Engineer: Holmes Consulting Group
Post Tensioning: BBR Contech
Concrete: Allied Concrete
Conslab constructed a new 9000m2 post tensioned slab over the renovated timber substructure to extend the life of the wharf.
The design had to allow for any intermediate beam to be able to fail.
At the same time the wharf had to be kept operating for the Bluebridge Ferries.